Miscellaneous 91397 1 appearance active
Public Works Transportation Projects - Cannonball Path Ph6 (Fish Hatchery Rd ROW)
Topics
Summary
Summary
This item concerns Phase 6 of the Cannonball Path project, specifically focusing on the segment along the Fish Hatchery Road Right-of-Way (ROW). The project aims to improve pedestrian and bicycle infrastructure. Key elements include:
- New Signal: A new traffic signal will be added at the Carver Street & Fish Hatchery Road intersection to accommodate diagonal bike crossings.
- Path Modifications: The existing on-street bike lane will be removed and replaced with a shared-use, off-street path (9-ft wide) with a 4-ft terrace. The sidewalk on the back-side will be widened to 8-9 ft.
- Bridge Work: A new bike-pedestrian bridge will be constructed over Wingra Creek. The existing Fish Hatchery Roadway bridge will remain as-is.
- Utility Adjustments: Sidewalks and terraces will be replaced and regraded, with work to address erosion issues from school parking lot runoff.
- Connectivity: The path will connect to the existing Wingra Creek Path. The intersection of Wingra Drive & Fish Hatchery Road will not be modified in this phase, as it is part of a future resurfacing project.
Citizen Impact
Residents will benefit from improved and safer bicycle and pedestrian facilities along Fish Hatchery Road, including a new bridge over Wingra Creek and enhanced intersection safety. The project will also improve the connection to the existing Wingra Creek Path.
Confidence
high
Committee Timeline
No timeline data available.