ORD Approp $9,400,000.00 from the Mobility Plan Proj-Zone 04 Acct to (1) the Dunn Ave at Braddock Rd Signal Improvements - Other Construction Costs Acct to Prov Funding for Traffic Signalization at the Braddock Rd & Dunn Ave Intersection ($4,400,000.00), & (2) the Pecan Park Rd Widening - I-95 to Main St - Engineering & Design Acct to Prov Funding for the Widening of Pecan Park Rd btwn I-95 & Main St ($5,000,000.00); Amend the 26-30 5-Yr CIP Appvd by Ord 2025-505-E to Reflect this Approp of Funds to the Projs; Waiving Sec 655.505 (Deposit of Mobility Fees, Mobility Zones; & Appropriation of Mobility Fees), Pt 5 (Mobility System), Ch 655 (Concurrency & Mobility Management System), Ord Code, to Allow Greater Than 20% of the Mobility Fees Deposited in the Mobility Zone 4 Acct to Be Allocated to the Braddock Rd & Dunn Ave Intersection Improvement Proj Described Herein; Auth the Mayor, or Her Desig, & the Corp Sec to Execute & Deliver a Locally Funded Agrmt (Lump Sum) btwn the FDOT & the City Pursuant to which the City Agrees to Pay FDOT $4,200,000.00 for Intersection Improvements at Braddock Rd & Dunn Ave; Prov for Oversight by the Engineering & Construction Mgmt Div of the Dept of Public Works (Revised B.T. 26-017) (Dillard) (Req of Mayor) (Co-Sponsors CMs Gaffney, Jr., Arias & Peluso) 11/25/25 CO Introduced: TEU, F 12/2/25 TEU Read 2nd & Rerefer 12/2/25 F Read 2nd & Rerefer 12/9/25 CO PH Read 2nd & Rerefer 1/6/25 TEU Approve 6-0 1/6/26 F Amend/Rerefer 7-0 1/13/26 CO Amend/Rerefer 18-0 1/21/26 TEU Amend/Approve 5-0 1/21/26 F Amend/Approve 6-0 1/27/26 CO PH Amend/Approve 17-0 Public Hearing Pursuant to Ch 166, F.S. & C.R. 3.601 - 12/9/25 & 1/27/26
Sponsors
Topics
Summary
Summary
This ordinance appropriates a total of $9,400,000.00 from the Mobility Plan Project-Zone 04 Account to fund two significant transportation infrastructure projects.
1. Dunn Avenue at Braddock Road Signal Improvements:
- $4,400,000.00 is allocated for traffic signalization, including a new signal and turn lanes at the intersection of Dunn Avenue and Braddock Road. This project is justified by existing traffic volumes to reduce severe crashes and delays.
- The City authorizes a payment of $4,200,000.00 to the Florida Department of Transportation (FDOT) for these improvements, covering design, right-of-way acquisition, construction, and inspection engineering. FDOT is expected to begin construction during its fiscal year starting July 1, 2026.
- The ordinance waives Section 655.505 of the Ordinance Code to allow more than 20% of Mobility Zone 4 fees to be allocated to this project, ensuring full funding.
2. Pecan Park Road Widening (I-95 to Main Street):
- $5,000,000.00 is allocated specifically for the Engineering and Design phase of widening Pecan Park Road from two lanes to five lanes between I-95 and Main Street. This project aims to address increased vehicle, pedestrian, and bicycle traffic from new residential and commercial developments, and will also resolve a long-standing drainage issue on the east side of the Pecan Park Road and Main Street intersection.
Both projects are incorporated into the 2026-2030 Five-Year Capital Improvement Program (CIP), which is amended by this ordinance. Oversight for these projects will be provided by the Engineering and Construction Management Division of the Department of Public Works.
Citizen Impact
Residents will experience improved traffic flow and safety at the Dunn Avenue and Braddock Road intersection due to new signalization and turn lanes. The widening of Pecan Park Road will reduce congestion and enhance safety for drivers, pedestrians, and cyclists, while also resolving persistent drainage issues in the area. These projects are funded by mobility fees, not new taxes.